Mary & John Geisse Soccer Complex Drainage Project

Mary & John Geisse Soccer Complex Drainage Project

 

January 2012 Construction Photos


Subsurface drainage connects to drainage structure of road.


Pipe buried under future road.

Metal pipe under future road.

Subsurface drainage connects to drainage structure on either side of future
road.

From the west, south of mound:  subsurface drainage connects to pipe under
road and then spills into swale.

Drainage structures on either side of future road.
Pipe under.

Between 56th and Mound is a future open drainage swale.
Water will travel in metal pipe under future road and empty into swale at
entrance to the main drainage pipe that brings water south to pond one.

The end (opening) of the main drainage pipe that takes water to pond one.
Shows the pipe under the future road empties here as well.

Subsurface drainage pipe installed along entire south side of mound.
Water will flow to the main drainage pipe taking water south to pond one.
Colts facility in rear.

Subsurface drainage installation, January, 2012

 

December 2011 Construction Photos