Mary & John Geisse Soccer Complex Drainage Project March Update

Mary & John Geisse Soccer Complex Drainage Project

 

March 2012 Construction Photos

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Future entrance road, looking from existing drive north to 56th Street,
3/7/12

 

 

 

Great topsoil donated by Colts spread on Mayor’s Gardens March 2012 to
improve soil quality and decrease instances of crop flooding.

 

 

View south along main drive along path of newly installed drainage pipe,
3/7/12

 

 

IPL relocates half dozen utility poles to make room for entrance, March,
2012.

 

 

Work on the entrance March 7, 2012.

 

Work on the entrance March 7, 2012.

 

Work on the entrance March 7, 2012.

 

Work on the entrance March 7, 2012.

 

Sub surface drainage pipe installed under gravel January 2012, this view is south of the mound looking toward Colts property line from the new entrance.

 

New utility pole installed 3/7/12

 

Work on the new entrance, 3/7/12

 

 

Work on the new entrance, 3/7/12

 

 

Work on the new entrance, 3/7/12

 

 

Work on the new entrance, 3/7/12

 

 

Work on the new entrance, 3/7/12

 

 

Work on the new entrance, 3/7/12

 

 

Work on the new entrance, 3/7/12

 

 

Work on the new entrance, 3/7/12

 

 

Work on the new entrance, 3/7/12

 

Future open drainage swale will feed into drainage pipe here. 3/7/12

 

 

Future open drainage swale will feed into drainage pipe here. 3/7/12

 

 

IPL on the job 3/7/12